Home
Our Team
Construction Services

Residential Clients Shown on GreyHairedGuys.com
Commercial Clients
NextStone & FinalFixx
Contact Us

Foundations

First Baptist Church, The Colony 4800 South Colony Blvd.

PROJECT - Stabilize foundation

Findings:

1- Foundation has dropped approximately 3", masonry damage

2- Drainage problem at East wall. During our visit the rain was moderate, the downspouts were pouring water directly around foundation – 3" had accumulated. This water is flowing around the N.E. Corner then flows under the North side foundation wall

3- Tree is too close to foundation, tree roots on the North & West-side walls. Tree roots can draw necessary moisture from soil under and around the foundation beam

4- West- side sidewalk – This sidewalk has dropped 2-3" over a 100' tipping toward the building foundation and screen wall. Sidewalks should tip at approximately 2% pitch toward the parking lot 5- No suspected plumbing leaks

Procedure:

1- Install 15 (fifteen) Commercial Steel Piers advanced to load bearing strata outside of building

2- Included
City Permits
Engineer Report
Breakouts
Leak Test
Repair masonry cracks and wall
Mudjack sidewalk 100 x 6 to original elevation
Root barriers 2 (two) 30' West-side / 36' North-side
Extend downspouts East-side or trench to terminate 20' from foundation

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
                 Home  -   Our Team  -   Construction Services  -   Residential Clients (shown on GreyHairedGuys.com)
Commercial Clients  -   NextStone & FinalFixx  -   Contact Us
                 Meeting all of your construction needs for over 30 years. Located in Dallas / Ft Worth Texas.
                 © Copyright    Facility Restoration & Construction Services
Custom Website Design by MartinasWeb.com