Home

Our Team

Construction Services

Commercial Clients

Black Hawk Energy
Saver System

Residential Clients Shown on GreyHairedGuys.com

NextStone & FinalFixx

Contact Us


PIER 1


Two-Hour Full Cure Resin For Concrete Repair- The expansion joints in the warehouse area were fracturing apart caused primarily from the client washing the warehouse floor every week with a light detergent and water with their floor scrubber. The metal expansion joint materials that were used during the construction of the building have rusted and expanded over time. The forklift dynamic peak impact loads gradually caused the concrete to separate and eventually cause damage to the forklift and stress to the driver.

Our specialty products bonds to "Concrete & Steel." The areas were jacked out, up to 4" deep, then primed and filled with our polymer resin. A long term repair solution for our client and their tenant, Pier 1 Imports.


1[frsvcs.com Construction Photo]
2[frsvcs.com Construction Photo]
3[frsvcs.com Construction Photo]
4[frsvcs.com Construction Photo]
5[frsvcs.com Construction Photo]
                 Home  -   Our Team  -   Construction Services  -   Residential Clients (shown on GreyHairedGuys.com)
Commercial Clients  -   NextStone & FinalFixx  -   Contact Us
                 Meeting all of your construction needs for over 30 years. Located in Dallas / Ft Worth Texas.
                 © Copyright    Facility Restoration & Construction Services
Custom Website Design by MartinasWeb.com